Fulcrum was selected to perform a complete dorm renovation to two, three story dormitories during their summer break. The Hampton and Windsor Hall dormitories received upgraded lighting and HVAC systems along with reconfiguration of living and common areas. New finishes were introduced throughout. During construction, existing fire assemblies needed to be update and installed. This process included engineered judgements and the development of new UL listed assemblies to accommodate the new and existing conditions. These improvements introduced another layer of complexity to the already strained construction schedule. Critical building shutdowns and general access was coordinated with several divisions of the University to ensure that continuity was maintained, and that staff and student safety was not impacted. In addition to upgraded living and amenity space in each building, Hampton Hall received a new state of the art gaming lounge which would help to usher in a new Competitive Esports Program.