Fulcrum was selected by Siemens as the construction manager for a 25,000sf clean room project which included a 6,000sf operation and control center. Work included: the installation of one 2,000 amp 400v 50hz power source; one 3,000 amp 480v 60hz power source, an 80 ton chiller / cooling tower; nitrogen tank farm, and associated nitrogen piping. All work was completed in an operational facility without disruption to production.