Construction Manager for 25,000sf ISO 7 Clean Room with 6,000sf operation and control center for the production of LED components. Work included the installation of two new power services; one 2,000 amp 400v 50hz and one 3,000 amp 480v 60hz as well as an 80 ton chiller/cooling tower, nitrogen tank farm, and associated nitrogen piping.