This project includes renovating existing space within the footprint of one of Masy Bio Services current buildings to facilitate the installation of a new freezer. Fulcrum was tasked with removing existing offices, a second story mezzanine, and a CMU demising wall which abutted an existing freezer. In addition to demolition, Fulcrum had to add a new stair and platform to maintain egress throughout the facility, install new Electrical gear and transformers, as well as rework the HVAC and fire protection for the new configuration. All this work had to be coordinated with the operating facility which could not be impacted and needed to transverse through the space to maintain full functionality.