Fulcrum was selected by High Mowing, a Waldorf co-educational school for day, boarding and homestay students ranging from early childhood through grade twelve, for the Construction of a new 9,200sf Science and Technology Building. The two-story building brought together a combination of construction techniques not usually found in a single structure –concrete foundation, steel frame, post & beam frame, conventional wood frame, stonework inside and outside and structural insulated panel walls.